Resolved: Gerstacker First Floor Electrical Maintenance – Sunday, July 12

  • Start: Sunday, July 12, 6:00 a.m.
  • End: Sunday, July 12, 10:00 a.m.

On Sunday, July 12 from 6:00 to 10:00 a.m., an electrical shutdown is scheduled on the first floor of the Gerstacker Building. Further information about this maintenance is available on the ITS Service Status page.