- Start: Friday, September 16, 6:00 a.m.
- End: Friday, September 16, 7:30 a.m.
On Friday, September 16 starting at 6:00 a.m., ITS will be moving network equipment from UPS power to building generator fed power on the ground floor of the Lurie Engineering Center. The is a possibility for a brief loss of network connectivity while the hardware reloads. Any potential outage should be less than 5 minutes during the maintenance window
Further updates about this maintenance will be posted on the ITS Service Status page.