On Saturday, July 28 from 7:00 a.m. to 3:00 p.m., the electrical substation that provides power to the Lurie Engineering Center (LEC) and the Industrial and Operations Engineering (IOE) building will be shutdown for preventative maintenance. The buildings should not be occupied during this time, as this outage will affect all power west of the Continue Reading »
Category: Resolved Service Status
Previously resolved Service Status postings:
Resolved: FXB Network UPS Replacement – Thursday, May 31
On Thursday, May 31 from 5:00 to 7:00 a.m., the uninterruptible power supply (UPS) for the network in the FXB building will be replaced. Further information is available on the ITS Service Status page.
Resolved: Chrysler Center Network UPS Replacement – Wednesday, May 30
On Wednesday, May 30 from 5:00 to 7:00 a.m., the uninterruptible power supply (UPS) for the network in the Chrysler Center will be replaced. Further information is available on the ITS Service Status page.
Resolved: Cooley Network UPS Replacement – Wednesday, May 30
On Wednesday, May 30 from 5:00 to 7:00 a.m., the uninterruptible power supply (UPS) for the network in the Cooley building will be replaced. Further information is available on the ITS Service Status page.
Resolved: EWRE Network UPS Replacement – Tuesday, May 29
On Tuesday, May 29 from 5:00 to 7:00 a.m., the uninterruptible power supply (UPS) for the network in the Environmental And Water Resources Engineering building will be replaced. Further information is available on the ITS Service Status page.
Resolved: Duderstadt Center Power Outage – Thursday, August 2
On Thursday, August 2 at 7:00 p.m. until Friday, August 3 at 6:00 a.m., the electrical substation that provides power to the Duderstadt Center will be shutdown for preventative maintenance. The buildings should not be occupied during this time, as this outage will affect all power west of the main corridor including restrooms, kitchenettes, lighting, Continue Reading »
Resolved: AEL & GFL Power Outage – Saturday, June 23
On Saturday, June 23 from 7:00 a.m. to 5:00 p.m., the electrical substation that provides power to the Aerospace Engineering Laboratory and the Gorguze Family Laboratory will be shutdown for preventative maintenance. The buildings should not be occupied during this time, as this outage will affect all power west of the main corridor including restrooms, Continue Reading »
Resolved: Online Performance Reviews Service Outage – Tuesday, May 8
The Online Performance Reviews application at reviews.engin.umich.edu was unavailable from 4:26 to 4:39 p.m. today due to a database outage. The issue has been resolved, and the underlying cause is being investigated.
Resolved: North Campus Research Complex Power Outage – Monday, May 7 to Friday, May 11
Beginning Monday, May 7 until Friday, May 11 from 5:00 to 7:00 a.m. each day, the electrical substation that provides power to the North Campus Research Complex Building 20 West will be shutdown for equipment upgrades. Building 20 West should not be occupied during this time, as this outage will affect all power west of Continue Reading »
Resolved: EECS Building Power Shutdown – Wednesday, May 9
On Wednesday, May 9 from 8:00 to 8:30 a.m., there will be a shutdown of the electric high voltage substation in the Electrical Engineering and Computer Science (EECS) building while facility operations performs maintenance.