Resolved: CLSE Server Maintenance – Thursday, May 10

On Thursday, May 10 between 5:00 and 8:30 a.m., maintenance has been scheduled for servers that support the CAEN Lab Software Environment (CLSE). This maintenance is intended to apply security patches, correcting recent operating system and software application vulnerabilities.

The following services may experience an outage during the above maintenance timeframe:

Continue Reading »

Resolved: Engineering Research Buildings 1 & 2 Power Shutdown – Saturday, April 7

On Saturday, April 7 from 7:00 a.m. to 5:00 p.m., there will be a power shutdown in the Engineering Research Buildings 1 & 2 while preventative maintenance is performed. The building should not be occupied during this time due to lighting, ventilation, networking, elevator, and life safety system service interruptions. Further information can be found Continue Reading »

Resolved: AFS Server Maintenance – Saturday, May 5

On Saturday, May 5 starting at 11:00 p.m., ITS will be performing maintenance on a database server that supports the umich.edu AFS cell. The maintenance is expected to be completed by Sunday. May 6 at 2:00 a.m. During this time, CAEN Linux workstations will be unavailable, including the remote access VNC servers (login.engin.umich.edu, login-course.engin.umich.edu, login-twofactor.engin.umich.edu, Continue Reading »

Resolved: CLSE Server Maintenance – Thursday, April 12

On Thursday, April 12 between 5:00 and 8:30 a.m., maintenance has been scheduled for servers that support the CAEN Lab Software Environment (CLSE). This maintenance is intended to apply security patches, correcting recent operating system and software application vulnerabilities.

The following services may experience an outage during the above maintenance timeframe:

Continue Reading »