Resolved: CLASP Electrical Shutdown – Saturday, July 30

  • Start: Saturday, July 30, 7:00 a.m.
  • End: Saturday, July 30, 3:30 p.m.

On Saturday, July 30 starting at 7:00 a.m., maintenance will be performed on the electrical substation supporting the Gerstacker building. During the maintenance window, power will be completely shut down for the building. The building should not be occupied during this time due to lighting, ventilation, networking, elevator, and life safety system service interruptions. All sensitive electronic equipment should also be turned off or unplugged.

Further updates about this maintenance will be posted on the ITS Service Status page.